Copper Prices Keep Moving. Keep Your Quotes Honest Anyway.
Copper tariff rules have changed more than once since August 2025. You can't predict the next change, but you can date your quotes, check supplier prices, and answer the price question straight.
TL;DR: Put a date and expiration on every quote. For large copper jobs, check the current supplier price before quoting and write down what happens if that cost changes before scheduling.
Copper tariff rules changed on April 6, 2026
In July 2025, the White House announced universal 50% tariffs on imports of semi-finished copper products and copper-intensive derivative products, effective August 1, 2025. The listed examples included copper pipes, wires, rods, sheets, tubes, pipe fittings, cables, connectors, and electrical components. Read the fact sheet.
Proclamation 11021 changed the structure again. The April 2, 2026 proclamation applied to goods entered on or after April 6, 2026. The White House fact sheet says pure copper articles pay 50% on their full value, derivative articles made substantially of copper pay 25% on their full value, and products with 15% or less copper content are no longer covered by those metals tariffs. Read the April fact sheet.
The list is still being reviewed. A Commerce Department notice scheduled for publication on August 6, 2026, asked for public comment on adding 14 more derivative articles, including parts of heat exchange units and fire extinguishers. The rules behind supplier pricing have changed more than once. You cannot predict the next change from your desk.
Your supply house invoice is the real number. Use it.
Every written quote needs a date and expiration
Write this on every quote:
This price is good until [date].
Pick a window that fits how often your supplier changes prices. Many shops use something like 30 days, but there is no single window that fits every shop. A small repair quote may need a different expiration than a large repipe quote.
The date does two jobs. It tells the customer how long the number stands. It gives your office a clear point for checking the material price again.
A call pattern shops see all the time goes like this. A homeowner calls back two or three months after receiving a repipe quote and says, “You told me a price in the spring.” They expect the same number.
When the old quote has no date, that call turns into an argument on the phone. When it has a date and an expiration, the call becomes, “Let us re-check the material price and send you a fresh number.” The job often still gets booked.
That is not a tariff explanation. It is a better quote.
Check the supplier price before large copper jobs
Do not price a large copper-heavy job from the invoice sitting in your file. Check the current supplier price during the week you quote it.
That applies to repipes, water heater swaps with copper connections, and new construction rough-ins. What you pay depends on your supplier. The invoice in front of you is the number that belongs in your quote.
For a water heater job, get the scope right before you price it. Ask the questions that affect the work, then quote from current material information. This water heater call checklist can help your office collect those details before the visit or quote.
Use the same pricing method across the shop. If you are still deciding how labor and material should appear on each call, review flat-rate or hourly pricing on every call. The point is not to guess at the material number. The point is to make the quote repeatable.
Put material changes in writing before the customer signs
On a large job, consider adding a material-price line to the quote. State that if the material cost changes before the job is scheduled, the quote gets re-priced.
Say that out loud before the customer signs. Do not wait until the customer calls to schedule and then introduce a new condition.
The wording should match how your shop actually operates. Do not promise that a quote stays open forever if your supplier price can change before scheduling. Give the customer a dated number, explain the expiration, and explain what happens if the material cost changes before the work is scheduled.
For a large job, you can also review deposits, terms, and late invoices. A deposit can help lock in material purchases when that is how your shop handles the job.
If PEX or another code-approved material fits the work and local code allows it, offer it as an option. Do not present it as a guaranteed cheaper choice. It gives the customer a second option, and the customer can decide which material fits the job.
Your phone answer should not create a false price
When a caller asks, “How much?” do not quote a firm material price from memory.
Explain how your shop prices the work. Ask the questions that scope the job. Give a range only if you have a current range. Then book the visit. The phone answer to “how much will it cost?” should help your team handle that question without making a promise the quote cannot support.
Bella answers the shop phone around the clock. When a caller asks how much, Bella explains how the shop prices work, asks the questions that scope the job, and books the visit without throwing out a material price it should not.
That keeps the phone answer separate from the written quote. The quote gets a date, an expiration, and current supplier information.
On the Growth plan, which is $295 per month, Bella also sends quote follow-ups. An open quote gets a nudge before its expiration date instead of going stale and returning as a price argument. The Starter plan is $95 per month. The Pro plan is $495 per month.
Tell regular customers when your price changes
Raising prices because materials went up is fine. Tell your regulars plainly. Do not let them discover the change only after a job is complete.
Use a dated quote for the new work and explain that the material price is based on current supplier information. If you need help with that conversation, use how to raise your rates without losing regulars.
A current quote is easier to defend than an old number recalled from memory. A written expiration is easier to explain than a price change introduced without warning.
Three questions owners ask about copper quotes
Do I have to use a specific quote expiration?
No. Pick a window that fits how often your supplier changes prices. Many shops use something like 30 days.
Can I keep an old quote for a customer who calls later?
The dated quote tells you whether its price is still open. If it has expired, re-check the material price and send a fresh number.
What price should I use for copper material?
Use the current price from your supply house. The invoice is the real number for your shop.